State&32;grid&32;xiangtan&32;shaoshan&32;converter&32;station(300Mvar&32;dual&32;water&32;cooling&32;camera)
State grid xiangtan shaoshan converter station(300Mvar dual water cooling camera)
First operation time: 2018;
Unit output: 300Mvar (PF0);
Cooling mode: double water internal cooling;
Rated voltage: 20kV;
Short circuit ratio: 0.75.
State grid xiangtan shaoshan converter station(300Mvar dual water cooling camera)
Contact Us
- Shanghai&32;Electric&32;Power&32;Generation&32;Equipment&32;Co&32;Ltd&32;Generator&32;Plant

Address:No.555,&32;JiangChuan&32;Road,&32;Minhang&32;&32;District,&32;Shanghai,&32;PRC

Post code:200240

Tel: 021-64626666

Fax:021-64626666