Shanghai&32;Boiler&32;Works&32;Co&32;Ltd.-
660-1000MW&32;Ultra-supercritical&32;Two-pass&32;PC&32;Boiler
(Ultra-)supercritical pressure spiral tube coil once-through boiler, single furnace arrangement, single intermediate reheat, tangential firing, balanced draft, full steel frame suspension structure. Two-pass arrangement, dry ash extraction.

    Superior performance, economical and environment-friendly 1000MW class two-pass ultra-supercritical PC boiler: 22 units; 600MW class tower type (ultra-) supercritical PC boiler: 55 units.

    Typical projects: Anhui Banji, Guotou Meizhouwan, Baolihua Jiahuwan, Huaneng Bajiao, Guotou Beijiang

The first self-developed 620℃ PC boiler in the world, which initiates high-parameter ultra-supercritical units and marks a milestone in thermal power generation industry development in China.

(1)Two-pass arrangement with better safety, reliability, and lower electricity consumption.(2)Advanced compound air classification low NOx tangential combustion system, high-efficient, environment friendly, with wider coal adaptability.(3)Reasonable heating surface arrangement and temperature regulation mode with better regulation of steam temperature.

Contact Us
Shanghai&32;Boiler&32;Works&32;Co&32;Ltd.
Address:No.250&32;Huaning&32;Road,&32;Shanghai,&32;PRC
Post code:200245
Tel: +86(21)6430&32;2391
Fax:+86(21)6430&32;1980