Temperature increase and efficiency increase retrofit project of 300MW units for Jianbi Power Plant breaks through the conventional scheme of only flow path retrofit, and the overall performance level of the unit is improved from the structure and thermal system. The successful operation of this project has demonstration significance for the comprehensive temperature and efficiency improvement of subcritical Units.
Shanghai electric's complete set retrofit technology of energy saving is to apply the international Advanced Integral Blade Technology (AIBT) of steam turbine at present, to combine with the retrofits of boiler, steam turbine generator and system auxiliary equipment, and to comprehensively optimize the thermal system, so as to realize the best matching of the performances of the steam turbine, steam turbine generator and boiler, to increase the capacity and improves efficiency to the maximum, and to make the operation of the power plant more economical, safe and reliable.