2023,The&32;2nd&32;Phase&32;150KV&32;Substation&32;Design,&32;Supply&32;and&32;Construction&32;Project&32;of&32;OKI&32;Factory&32;and&32;the&32;Supply&32;Project&32;of&32;150KV&32;GIS&32;for&32;the&32;4th&32;Phase&32;of&32;IKK&32;PINDO&32;Factory&32;of&32;APP&32;Indonesia&32;
The project scope undertaken by our company is including: the design, procurement, and test and commissioning of the 150kV main power supply system for the 2nd phase of the OKI pulp mill; the electrical design, supply, installation guidance, test and commissioning, trial operation guidance of the 150 KV GIS power distribution system of the 4th phase of the IKK PINDO factory. The performance of this project promotes the company's in-depth development.
Subsequently, our company has undertaken the OKI PPE low-voltage inverter package, OKI low-voltage motor package, OKI lighting package, OKI PPE medium-voltage package, IKK 1C 33KV switch cabinet package, IKK motor package, IKK BM1 switch cabinet and transformer package, IKK BM2 switch cabinet and transformer package, IKK PM3 switch cabinet and transformer package, IKK OCC switch cabinet and transformer package, IKK GCC switch cabinet package, etc.
Asia Pulp & Paper (APP) Sinar Mas is an important enterprise under the Indonesian SinarMas Paper Group. Currently, the SinarMas Group has become one of the largest pulp and paper-making groups in the world. Its main production capacity distribution, production R&D, manufacturing supply chain, etc. are mainly concentrated in China and Indonesia, and the cooperation prospects are broad.
This project has achieved the first breakthrough of SPTDE in the Indonesian market and the papermaking industry market.
This project has achieved the first breakthrough of SPTDE in the Indonesian market and the papermaking industry market.