2008,&32;EPC&32;of&32;BBDA&32;400kV&32;Transmission&32;Line&32;Project&32;in&32;Ethiopia.
The project amount is $168 million and the construction period is 18 months. This project form the backbone grid in northern Ethiopia, which includes 500km transmission line of 400kv, 17km transmission line of 230kv and one 400kv substation, among which the 400kv Bahirdar substation is a hub substation in north Ethiopia.
This project form the backbone grid in northern Ethiopia, which includes 500km transmission line of 400kv, 17km transmission line of 230kv and one 400kv substation, among which the 400kv Bahirdar substation is a hub substation in north Ethiopia.
This project form the backbone grid in northern Ethiopia, which includes 500km transmission line of 400kv, 17km transmission line of 230kv and one 400kv substation, among which the 400kv Bahirdar substation is a hub substation in north Ethiopia.
Contact Us
- Shanghai&32;Electric&32;Power&32;Transmission&32;&&32;&32;Distribution&32;Engineering&32;Co.,&32;Ltd&32;.

Address:4th&32;Floor,No.1395&32;Yu&32;Yuan&32;Rd,Shanghai,PRC

Post code:200250

Tel: 8621-52371666

Fax:8621-52378863