New&32;Plant&32;Construction&32;Project&32;(annual&32;output&32;more&32;than&32;300,000&32;passenger&32;vehicles)&32;of&32;Changsha&32;Branch&32;O&32;ce,&32;SAIC&32;Volkswagen&32;Automotive&32;Co.,&32;Ltd.
The Project is for vehicle plant construction with annual output more than 300,000 passenger vehicles. The total investment is CNY 12.1 billion, including four process workshops (i.e. pressing shop, bodywork shop, painting shop and assembly shop) and the corresponding matched production & storage workshops and office facilities, etc. The area of base is 1.53 million m2 and total floor area 0.58 million m2.
Shanghai Electric, with the advanced global standard plants as the construction philosophy, by combining with energy saving green building, forms the radial functional zones with four workshops as core region in the whole plant. The degree of automation in workshop, degree of energy-saving & environmental protection and overall manufacturing technology are at the international first-class level, with the process units such as press line, body welding line, painting line, assembly line, etc. awarded of Three-star Green Building title.