&32;Shenneng&32;&32;Power&32;Plant&32;Phase&32;II&32;Project&32;
This project is an extension project of Pingshan Power Plant. A new 350MW supercritical secondary reheat coal-fired power plant with high efficiency is constructed by utilizing some public and auxiliary facilities of the first phase of the project, and flue gas desulfurization and denitrification facilities are constructed synchronously. The first phase project of the power plant has built 2 x 660 MW ultra-supercritical units.
At present, the 1350MW unit is the largest thermal power unit in China and the benchmark project of thermal power in China. Our company has provided the only domestic made rotor fan equipment in this project: the FD fan equipment. The equipment is designed and manufactured independently by our company after digestion and absorption, using the technology of TLT Company from Germany.
Shenneng Anhui Pingshan Power Plant Phase II is located in Pingshan and Kuanglou Village, Gurao Town, Lishan District, Huaibei City. It is located in the south of Huaibei City , the new economic development zone of Huaibei City.
The production of this fan means that the production capacity of our fan has reached the world advanced level.
Contact Us
- Shanghai&32;Electric&32;Blower&32;Works&32;Co.,&32;Ltd.
Address:No.&32;87,&32;Guang&32;Yue&32;Zhi&32;Road,Shanghai,&32;200434,&32;P.R.&32;China
Post code:200072
Tel: 021-55983000
Fax:021-55983098