Shanghai&32;Electric&32;Power&32;Generation&32;Equipment&32;Co&32;Ltd&32;Turbine&32;Plant-
Yudai,Nanjing:Ultra&32;high&32;parameter&32;50MW
Huaneng Nanjing Yudai,chemical industrial park coal-fired cogeneration projects is 3 extraction backpressure 50 MW steam turbine.Because the inlet steam parameters optimization,the project has conducted two bidding.Shanghai Electric with other domestic enterprises successfully won the bid.
    • Rate power:50MW(max60MW)

    • Steam inlet :10MPa/565℃

    • Steam extraction :2.6MPa/371℃/85t/h(max120t/h)

    • Rate flow:480t/h(max495t/h)

    • Regeneration system:3(2HP+1DE

    • Back pressure:1.6MPa



The steam turbine main steam temperature and pressure and the performance of the domestic first,NOX emissions down half compared with national emission standards 100 mg/m3,finally can ensure pollutant emission levels close to the standard of gas turbine,technical and economic indicators to be advanced in the same type turbine.As a new exploration for the development of urban heating and industrial project supporting, Huaneng group Nanjing chemical industrial park of power plant project may be defined as the demonstration project of group structure adjustment and transformation, Shanghai Electric and model project of huaneng strive to make it.

1)Safety and reliability

We are, and will always be making safety and reliability put first. With the experience of the continuously accumulated operation data from more than 2,000 units, we can ensure the safety and reliability of new designed units throughout the lifecycle and the units can continuously run for over five years.

2)High efficiency

The top performance record is continuously refreshed by our start-of-art technology of AIBT full-automatic flow path design system and CFD technology.

3)Easy installation

For maximum easy installation, we can provide integral transportation.

4)Operation flexible

We always focus on making operation more flexible. Through online real-time analysis of the thermal stress, full-automatic control of unit during startup, normal operation, load change and shutdown can be realized.

5)Maintenance convenience

We are dedicated to make maintenance much simpler, only twice overhauls throughout the 30-year service life, increasing at least 4,000 operating hours.



Contact Us
Shanghai&32;Electric&32;Power&32;Generation&32;Equipment&32;Co.,&32;Ltd.&32;Turbine&32;Plant