Shanghai&32;Power&32;Station&32;Auxiliary&32;Equipment&32;Plant-
Steam&32;Conversion&32;Products&32;for&32;Comprehensive&32;Utilization&32;of&32;Nuclear&32;Energy
We have developed a new-structured four-process evaporator using an integrated design concept. Innovatively, it incorporates two sets of tube bundles—one for in-tube condensation and the other for in-tube subcooling—within the same evaporator shell, enabling an evaporation process with dual phase change.

We have developed a new-structured four-process evaporator using an integrated design concept. Innovatively, it incorporates two sets of tube bundles—one for in-tube condensation and the other for in-tube subcooling—within the same evaporator shell, enabling an evaporation process with dual phase change. This evaporator achieves efficient evaporation and steam generation under a small temperature difference (with a wall superheat 3). The heat exchange equipment meets the requirement of 2,500 start-stop cycles, allows continuous load adjustment between 20% and 100%, satisfies the demand for rapid start-stop of industrial thermal loads, and ensures both high safety and high reliability.

This evaporator achieves efficient evaporation and steam generation under a small temperature difference (with a wall superheat 3). The heat exchange equipment meets the requirement of 2,500 start-stop cycles, allows continuous load adjustment between 20% and 100%, satisfies the demand for rapid start-stop of industrial thermal loads, and ensures both high safety and high reliability.

Contact Us
Shanghai&32;Electric&32;Power&32;Generation&32;Equipment&32;Co.,&32;Ltd.&32;Shanghai&32;Power&32;Station&32;Auxiliary&32;Equipment&32;Plant
Address:No.&32;621&32;Longchang&32;Road,&32;Shanghai,China
Post code:200090
Tel: 60708088
Fax:65430371